Page 942 | CORRESPONDENCE,ETC. |
cross-ties, however, over the whole road very much decayed, and much work was done in replacing them with new ones after trains commenced running. The road was occasionally broken by guerrillas, but never seriously injured until Wheeler's raid in August, 1864, when about twenty-five miles of track were torn up and destroyed.
Miles.
Main track laid in first instance................ 5 1/2
After several small raids........................ 1
After Wheeler's raid in 1864..................... 25
On Dalton branch,in first instance............... 2
After Hood's division............................ 1 1/2
-------
Total main track................................. 35
Sidings.
Location. Length. Location. Length.
Feet. Feet.
Chattanooga Sweetwater
1,155 220
Stone Quarry 550 Philadelphia 1,450
Tunnel 250 Lenoir's 1,050
Tyner's 787 Saw Mill 420
Ooltewah 445 Erin 850
McDonald's 2,455 Knoxville 4,760
Cleveland 310 West leg of Y 920
Mouse Creek 1,470 Total 17,832
Reagan's 740
Total length of track laid, 38 miles 1,992 feet.
Bridges.
The only important bridges on this line are those over the Hiwassee and Tennessee Rivers. Both of these were built of trestles in the first place, but afterward replaced with permanent structures. The following are the demensions of these bridges:
Height. Total length. Rebuilt.
Feet. Spans. Feet. Feet.
Hiwassee
47 3 301 301
Tennessee 85 11 1,700 1,700
Total --- --- 2,001 2,001
Total bridging by Government 4,002 feet.
The permanent bridges were built by contract and cost $161,990.26.
Water stations.
Where built. Number of tanks.
Chattanooga 2
Ooltewah 2
Tunnel 1
Riceville 3
Sweetwater 2
Total 10